Lee Drive overlay work aims to improve road conditions ahead of larger expansion project
Related Story
BATON ROUGE — Drivers traveling along Lee Drive could soon get relief from the potholes, cracked asphalt and uneven pavement that have made the stretch difficult to navigate.
Mayor-President Sid Edwards announced the city-parish is moving forward with overlay work on Lee Drive between Perkins and Highland roads, rather than waiting for a larger improvement project to address the deteriorating roadway.
Edwards said the current conditions have raised concerns about both driver comfort and public safety.
"This is one of the worst roads in the parish, in my opinion, in terms of bumpy rides and potholes and cracked asphalt," Edwards said. "But I just felt something needed to be done now. Number one, for the public safety aspect, it was not a safe road."
The overlay project is intended to provide immediate relief for motorists who regularly use the busy corridor.
For Baton Rouge resident Ephraim Robinson, Lee Drive serves as a vital connection between his neighborhood and the LSU area. He said the rough surface makes for an uncomfortable drive and leaves him worried about wear and tear on his vehicle.
Robinson welcomed the planned repaving but said he hopes future upgrades account for the surrounding neighborhoods and schools.
"It's still a residential neighborhood, it's still schools," Robinson said. "You don't want too many people flying through going 100 miles an hour."
The overlay work is separate from a larger proposed Lee Drive improvement project that officials say will address the corridor's long-term needs. Plans for that effort include expanding roadway capacity, adding turning lanes and installing accommodations for pedestrians and bicyclists.
Right-of-way acquisition is underway, with construction anticipated to begin in 2029.
While many drivers are looking forward to the upgrades, some nearby residents have expressed concerns about how a future widening project could affect their properties and the character of the surrounding neighborhood.
For now, the overlay work will serve as a stopgap measure to improve road conditions while the broader project moves forward.